Development of design and construction documents (stage "P" and "RD") in section "KM" and "foundations and metal structures" on the projects:
- The case of condensation, crushing and filtration,
- Administrative building.
Project was developed taking into account the seismic activity of the region (8 points).
Performed field supervision of construction projects.
Description:
Construction of mining and processing plant at the Kyzyl-Tashtyg polymetallic deposits in Tyva oversees mining company "Longxing" (China).
The cost of investment in the project 1803.7 million rubles.
Already in 2012. plant should reach full capacity - 1 million tons of ore per year. Finally the output will be 1 million tons of concentrate.
Kyzyl-Tashtyg deposit is located 200 km north-west of the Kyzyl. It has high zinc content, as well as gold, silver, cadmium, selenium, copper, barium, cadmium and lead. The raw material base consists of 12.9 million tons of ores, 2 million tons of copper ores C2 and 6.2 million tons of sulfur-pyrite ores C1.
A link to the description